Our Atlanta, Georgia Gateway Facility provides our primary Remote Backup servers with a 100 Mbps direct connection to Level 3 Communications international, fiber-optic Internet Backbone. Our offices are located in St. Augustine, Florida. Our main servers are located in our Atlanta, Georgia data facility. 
Our Atlanta RBS servers are connected to Level 3 Communication's International Fiber Optic Network. Level 3 Communications owns one of the largest International Communications and Internet Backbones in the world. With our direct connection to level 3' Communication's "Internet backbone" we can provide High Speed online backups 50 to 100 time faster than service providers using AT&T, Comcast, Road Runner, or any other Data Centers. 

The Atlanta Data Center on Courtland Street provides premium space built with connectivity to Level 3’s premier network and the networks of numerous alternate carriers such as those listed below. Alternate Carriers - Atlanta, Georgia Facility |
AT&T Local ICG Communications Local On Fiber Bell South
| Progress Telecom WorldCom Local Looking Glass Networks Frances Telecom Alltell
|
Atlanta Data Center Facility Details |
Power - N+1 electrical design and distribution, including redundant UPS and battery backup
- Automatic Transfer Switches ensure smooth transition to backup power
- 24-hour back-up generator — enough capacity to power more than 3,438 homes
- 99.999% power availability
- At least 125 watts/sq. ft. of primary breaker power (with the ability to upgrade)
| Space - 65,835 sq. ft. total space
- 21,300 sq. ft. raised floor space
- Nine-foot ceiling height clearance
- Cabinets and Suites available
- Raised floors with structural capacity of 300 lbs./sq. ft.
- Three-tiered overhead ladder racking
- Zone 1 Seismic Code Construction
| Environmental Controls - Temperature of 72 degrees +/- 6 degrees
- Humidity at 50% +/- 10%
- Dry-piped, double-interlocked, pre-action fire protection system
Support - Technical support available 24 x 7
|

Flicker Thomas is shown below as he supervises the installation of Flickertronics.com 2 Terabyte (2,000 Gigabyte) Super Server in Level 3 Communications Atlanta Data Center in July 2006. The installation is performed by one of our highly skilled contractor technicians. We have similar arrangements with on site personnel available at 42 Data Center locations in the USA, the United Kingdom and all European locations as well, and they can respond to any problem in those facilities in less than 2 hours. 
|